REMEDIAL

WAVERTON

This building required SBM to complete a comprehensive façade upgrade that included rectification of brickwork, concrete spalling repairs, crack stitching and exterior painting. SBM removed and disposed of asbestos-containing materials and reinstated the cladding on the rooftop structure. The works involved a full removal and upgrade of all windows and replacement of existing balustrades with modern semi frameless glass balustrades. SBM were also required to replace corrosive elements and fire rating to structural components.

Previous
Previous

WARWICK FARM